Monday, January 3, 2011

Colors Of Lenten Candles

fitting Powertrain

After the belt housing has been completed, we installed the pulleys and motors. After everything was fitted by means of lift and forklifts, we have the motors and aluminum parts dismantled and the case comes only once in the pickling bath. For the attachment to the body, only the existing four rubber pads used on the even of the Boxer engine and transmission were mounted earlier.

Blog_100_1024 Blog_102_1024 Blog_101_1024

0 comments:

Post a Comment